Monday, June 10, 2013

Kitchen renovation: Flooring!

The flooring is beautiful!! Today they did a " bowling alley" swath (the width of the hallway) from one end of the house, all the way down the hall and into the two hall closets.

The owner of the company that's doing the work came by this morning and determined that the short end of the L-shaped knee wall (where the railing used to be) came over too far and made the stairway too narrow at the top, so they hacked a couple inches off. They also put baseboard on the knee wall today. The drywall and painting guys will need to come back to fix the knee wall now, but it's not a lot.

More flooring tomorrow...

6/9 dinner: J-Mav and I went to Red Robin. I don't even know what Hubby and Keeper Boy did... I think they went to Taco Bell. Keeper Boy was subbing for another high school team last night and there was no time to grab dinner all together between the Nats game and the hockey game.

6/10 dinner: Ham (pre-cooked) and mashed potatoes and peas in the microwave. Couldn't do anything on the grill or grill burner because it was MONSOONING.

No comments: